Procurement Documents for pre-qualification of Reserved Specialists have been added.

April 2019
Guidance on Procurement of Contractors amended.Design Team Procedures DTP-2012 Procuring Construction Contractors has been revised.Suitability Assessment Questionnaires DoES QW 1 (with and without Reserved Specialists) and 3 have been updated.Revised Appendix B2Certificate of Satisfactory Execution has been added.
Appendix M – Marking Scheme Explanatory Notes has been added.
Appendix L – CV Template  has been added.
Template de-briefing letter has been revised.

December 2018
New TGD-007 - Template Letter of Acceptance (for use with Public Works Short Form of Contract)

December 2018
New circulars have been published advising of updated Cost Limits for Post Primary and Primary School Buildings effective from 1st December 2018 (see Cost Limits/Cost Plan Templates below).

November 2018
DTP 2012 Tender Summary Form has been updated to align with current Capital Works Management Framework documents. Scroll down to view. 

September 2018
Design Team Procedures for Small Works (TGD-007) updated to reflect increased threshold for use of the Public Works Short Form of Contract (PW-CF6) and other changes.

August 2018
Title of “OJEU (TED) Contract Notice checklist” changed to “OJEU (TED) Contract Notice checklist Main Contractor”
New “OJEU (TED) Contract Notice checklist Reserved Specialists” added


Procedures & Cost Plans

Procedure & Cost Plan documents are organised in the following categories:

1. Design Team Procedures [DTPs]
2. Stage Completion Certificates
3. Contract Notices & Contractor Suitability Assessment Questionnaires
4. DTP Template Documents
5. Cost Limits/Cost Plan Templates
6. Archive Documents

Document Edition and Revision
Document edition numbers and revisions are stated on the cover of each document. To check for previous versions follow the link to the relevant section and scroll down to ARCHIVE DOCUMENTS.


DESIGN TEAM PROCEDURES

STAGE COMPLETION CERTIFICATES

CONTRACT NOTICES & CONTRACTOR SUITABILITY ASSESSMENT QUESTIONNAIRES

MAIN CONTRACTORS AND RESERVED SPECIALISTS

(See DTP 2012 Procuring Construction Contractors (Revision April 2019) under Procedures and Cost Plans above for guidance)

MAIN CONTRACTORS

RESERVED SPECIALISTS

DTP TEMPLATE DOCUMENTS

COST LIMITS / COST PLAN TEMPLATES


 

ARCHIVE DOCUMENTS